At SRDB we have a strong commitment to working as efficiently as possible and to being good stewards of the environment. To that end, we are looking ahead to a time when we can prefabricate more components in our workshop before installing them at building sites. There are advantages to this approach both for us and for our clients. It allows us to continue working during inclement weather that might otherwise interrupt the process. It also saves time in that the work can be more centralized and requires less travel back and forth to construction sites every day.
Although our vision of a fully functional pre-fab process will develop over time, we have taken our first steps in that direction by constructing a facility in Maxwelton, West Virginia, to house our offices and an expanded shop. In the near term, we aim to increase the efficiency of our current operations Our goal is dial in the process as much as possible, making it more ecological and cost effective.